Planning Approval

Application No: 22/00148/CLEUD Location: Little Upton Farm Gatehouse Road Ryde Isle Of Wight PO33 4BS Application for a Lawful Development Certificate to establish compliance with Condition No.1 on P/00107/19 to confirm that a lawful material commencement has taken place.

Planning Applications

Application No: 22/00452/RVC Parish(es): Havenstreet And Ashey Ward(s): Newchurch Havenstreet And Ashey Location: Rowlands Farm Rowlands Lane Ryde Isle Of Wight PO33 4DE Proposal: Removal of condition 5 on 21/01133/HOU to include details of doors and windows under condition 2; Variation of conditions 2 and 4 on 21/001133/HOU to allow alterations to structural design and thermal improvements to include reinstatement of ground floor wall, changes to staircase and relocation of window on East elevation

Application No: 22/00507/FUL Parish(es): Havenstreet And Ashey Ward(s): Newchurch Havenstreet And Ashey Location: Brickfields Cottage Newnham Road Binstead Ryde Isle Of Wight PO33 3TH Proposal: Proposed agricultural machinery workshop

Planned Roadworks

The Isle of Wight Council (Carters Road, Ryde, Isle of Wight) (Temporary One-Way Restriction) Order No 1 2022

Island Roads on behalf of The Isle of Wight Council give notice that from 1800 hours from Friday 01 April until 1800 hours on Friday 22 April 2022, or when the works has been completed, a one-way restriction will be introduced in a west to east direction, along Carters Road from its junction with Upton Road to its junction with Ashey Road. These will be phased works and the alternative routes, where applicable, will be sign posted locally. The closure is required for safety during the Smallbrook Junction Improvement Scheme.

The Isle of Wight Council (Smallbrook Lane, Ryde, Isle of Wight) (Temporary One-Way Restriction) Order No 1 2022

Island Roads on behalf of The Isle of Wight Council give notice that from 1800 hours from Friday 01 April until 1800 hours on Friday 22 April 2022, or when the works has been completed, a one-way restriction will be introduced in a west to east direction, along Smallbrook Lane from its junction with Ashey Road to its junction with Great Preston Road. These will be phased works and the alternative routes, where applicable, will be sign posted locally. The closure is required for safety during the Smallbrook Junction Improvement Scheme.

The Isle of Wight Council (Ashey Road, Ryde, Isle of Wight) (Temporary Prohibition of Through Traffic) Order No 1 2022

Island Roads on behalf of The Isle of Wight Council give notice that from 1800 hours from Friday 01 April until 1800 hours on Friday 22 April 2022, or when the works has been completed, no person shall cause any vehicle to proceed along Ashey Road between its junctions with Green Lane and Smallbrook Lane. These will be phased works and the alternative routes, where applicable, will be sign posted locally. The closure is required for safety during the Smallbrook Junction Improvement Scheme.

The Isle of Wight Council (Ashey Road, Ryde, Isle of Wight) (Temporary Prohibition of Through Traffic) Order No 2 2022

Island Roads on behalf of The Isle of Wight Council give notice that from 1800 hours from Friday 01 April until 1800 hours on Friday 22 April 2022, or when the works has been completed, no person shall cause any vehicle to proceed along Ashey Road between its junctions with Smallbrook Lane and Bettesworth Road. These will be phased works and the alternative routes, where applicable, will be sign posted locally. The closure is required for safety during the Smallbrook Junction Improvement Scheme.

The Isle of Wight Council (Carters Road, Ryde, Isle of Wight) (Temporary Prohibition of Through Traffic) Order No 1 2022

Island Roads on behalf of The Isle of Wight Council give notice from 1800 hours from Friday 01 April until 1800 hours on Friday 22 April 2022, or when the works has been completed, no person shall cause any vehicle to proceed along Carters Road between its junctions with Upton Road and Smallbrook Lane. These will be phased works and the alternative routes, where applicable, will be sign posted locally. The closure is required for safety during the Smallbrook Junction Improvement Scheme.

The Isle of Wight Council (Smallbrook Lane, Ryde, Isle of Wight) (Temporary Prohibition of Through Traffic) Order No 1 2022

Island Roads on behalf of The Isle of Wight Council give notice that from 1800 hours from Friday 01 April until 1800 hours on Friday 22 April 2022, or when the works has been completed, no person shall cause any vehicle to proceed along Smallbrook Lane between its junctions with Ashey Road and Great Preston Road. These will be phased works and the alternative routes, where applicable, will be sign posted locally. The closure is required for safety during the Smallbrook Junction Improvement Scheme.

The Isle of Wight Council (Combley Road and Havenstreet Main Road, Havenstreet, Isle of Wight) (Temporary Prohibition of Through Traffic) Order No 1 2022

Island Roads on behalf of The Isle of Wight Council give notice that from for three days between 0900 and 1600 hours between Monday 28 March 2022 and Wednesday 30 March 2022, or when the works has been completed, no person shall cause any vehicle to proceed along Combley Road, between its junctions with Gravel Pitt Lane and the Sewage Works access road. The alternative route will be sign posted locally. The closure is required for safety drainage and quartering works.

The Isle of Wight Council (Green Lane, Brading, Isle of Wight) (Temporary Prohibition of Through Traffic) Order No 1 2022

Island Roads on behalf of The Isle of Wight Council give notice that for one shift between 0800 and 2300 hours between Monday 28 March 2022 until Wednesday 30 March 2022, or when the works has been completed, no person shall cause any vehicle to proceed along Green Lane, between its junctions with Ashey Road and West Lane. The alternative route will be sign posted locally. The closure is required for safety during ditching works.

The Isle of Wight Council (East Ashey Lane, Brading, Isle of Wight) (Temporary Prohibition of Through Traffic) Order No 1 2022

Island Roads on behalf of The Isle of Wight Council give notice that for one shift between 0800 and 2300 hours between Monday 28 March 2022 until Wednesday 30 March 2022, or when the works has been completed, no person shall cause any vehicle to proceed along East Ashey Lane, between its junctions with Ashey Road and West Lane. The alternative route will be sign posted locally. The closure is required for safety during ditching works.

Local Access Forum – Parish Consultation

Local Access Forum Consultation March 2022

Planning

Application No: 22/00265/HOU Parish(es): Havenstreet And Ashey Ward(s): Newchurch Havenstreet And Ashey Location: Farm House Gatehouse Farm Gatehouse Road Ryde Isle Of Wight PO33 4BJ Proposal: Proposed single/two storey extension to include balcony over single storey element

Application No: 22/00320/FUL Parish(es): Havenstreet And Ashey Ward(s): Newchurch Havenstreet And Ashey Location: Great Upton Farm Gatehouse Road Ryde Isle Of Wight PO33 4BS Proposal: Demolition of existing barn; proposed new dwelling

Application No: 22/00338/RVC Parish(es): Havenstreet And Ashey Ward(s): Newchurch Havenstreet And Ashey Location: Rowlands Farm Rowlands Lane Ryde Isle Of Wight PO33 4DE Proposal: Variation of condition no 2 on 21/00935/LBC to vary the details of the North and East doors and the West window from the approved scheme.

Application No: 22/00357/RVC Parish(es): Havenstreet And Ashey Ward(s): Newchurch Havenstreet And Ashey Location: Rowlands Farm Rowlands Lane Ryde Isle Of Wight PO33 4DE Proposal: Variation of condition no 2 on 21/00934/HOU to vary the details of the North and East doors and the West window from the approved scheme.

Application No: 22/00367/RVC Parish(es): Havenstreet And Ashey Ward(s): Newchurch Havenstreet And Ashey Location: Rowlands Farm Rowlands Lane Ryde Isle Of Wight PO33 4DE Proposal: Removal of condition 5 on 21/01134/LBC to include details of doors and windows under condition 2; Variation of conditions 2 and 4 on 21/001134/LBC to allow alterations to structural design and thermal improvements to include reinstatement of ground floor wall, changes to staircase and relocation of window on East elevation

Roadworks Planned

The Isle of Wight Council (Combley Road and Havenstreet Main Road, Havenstreet, Isle of Wight) (Temporary Prohibition of Through Traffic) Order No 1 2022

Island Roads on behalf of The Isle of Wight Council give notice that from for three days between 0900 and 1600 hours between Monday 28 March 2022 and Wednesday 30 March 2022, or when the works has been completed, no person shall cause any vehicle to proceed along Combley Road, between its junctions with Gravel Pitt Lane and the Sewage Works access road. The alternative route will be sign posted locally. The closure is required for safety drainage and quartering works.

The Isle of Wight Council (East Ashey Lane, Brading, Isle of Wight) (Temporary Prohibition of Through Traffic) Order No 1 2022

Island Roads on behalf of The Isle of Wight Council give notice that for one shift between 0800 and 2300 hours between Monday 28 March 2022 until Wednesday 30 March 2022, or when the works has been completed, no person shall cause any vehicle to proceed along East Ashey Lane, between its junctions with Ashey Road and West Lane. The alternative route will be sign posted locally. The closure is required for safety during ditching works.

© Copyright Havenstreet and Ashey Parish Council – Isle of Wight - Designed by Foundation Multimedia